|
| MIL-R-24661(SH)
6.2 Ordering data.
Acquisition documents should specify the
6.2.1 Acquisition requirements.
following:
(a) Title: number, and date of this specification.
(b) Color, if other than fluorescent orange (see 3.10).
(c) If first article inspection report and procedure is to be
submitted (see 4.3.2).
(d) If atmospheric pressure, temperature or relative humidity during
tests is other than specified (see 4.5).
(e) Level of packaging and packing required (see 5.1 and 5.2).
6.2.2 Data requirements. When this specification is used in an acquisi-
tion and data are required to be delivered, the data requirements identified
below shall be developed as specified by an approved Data Item Description
(DD Form 1664) and delivered in accordance with the approved Contract Data
Requirements List (CDRL), incorporated into the contract. When the provisions
of DoD FAR Supplement, Part 27, Sub-Part 27.410-6 (DD Form 1423) are invoked
and the DD Form 1423 is not used, the data specified below shall be delivered
by the contractor in accordance with the contract or purchase order requirements.
Deliverable data required by this specification are cited in the following
paragraphs.
Applicable DID no.
Data requirement title
Paragraph no.
Option
DI-T-4902
4.3.2
First article inspection
report
----
First article inspection
DI-T-4901
4.3.2
procedure
(Data item descriptions related to this specification, and Identified in
section 6 will be approved and listed as such in DoD 5000.19L. , Vol. II, AMSDL.
Copies of data item descriptions required by the contractors in connection with
specific acquisition functions should be obtained from the Naval Publications
and Forms Center or as directed by the contracting officer.)
6.2.2.1 The data requirements of 6.2.2 and any task in sections 3, 4, or
5 of this specification required to be performed to meet a data requirement may
be waived by the contracting/acquisition activity upon certification by the
offeror that identical data were submitted by the offeror and accepted by the
Government under a previous contract for identical item acquired to this speci-
fication. This does not apply to specific data which may be required for each
contract regardless of whether an identical item has been supplied previously
(for example, test reports).
6.3 First article. When a first article inspection is required, the
items should be a first article sample. The contracting officer should include
specific instructions in acquisition documents regarding arrangements for
examinations, approval of first article test results and disposition of first
articles. Invitations for bids should provide that the Government reserves
9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |