| MIL-R-24661(SH)
the right to waive the requirement for samples for first article inspection to
those bidders offering a product which has been previously acquired or tested
by the Government, and that bidders offering such products, who wish to rely
on such production or test, must furnish evidence with the bid that prior
Government approval is presently appropriate for the pending contract.
6.4 Sub-contracted material and parts. The packaging requirements of
referenced documents listed in section 2 do not apply when material and parts
are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
Preparing activity:
Navy - SH
(Project 4220-N298)
10
|