Click here to make tpub.com your Home Page

Page Title: Heat-sealed seam
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-45012E
4 . 5 . 1 0 . 2 Heat-sealed seam.  T h e sample level A rifle unit packages
s h a l l be subjected to the heat-sealed seam test specified in MIL-P-116.
4 . 5 . 1 0 . 3 Vacuum retention.  A sufficient vacuum shall be drawn to
c a u s e the flexible barrier of level A unit packages to cling snugly to
t h e enclosed item.  C a r e shall be exercised to insure that an excessive
amount of vacuum is not applied which might cause puncture or rupture
of the barrier.
4.5.10.3.1 Interpretation of results, After remaining undisturbed
at room temperature for two h o u r s , the barrier shall be examined to
d e t e r m i n e whether it is still taut and retracts against the item when
drawn away and quickly released.
4 . 5 . 1 0 . 4 Manufacturer installed equipment test. Manufacturer
i n s t a l l e d equipment packaged shall be subjected to the leakage test
s p e c i f i e d in MIL-P-116.
5. PREPARATION FOR DELIVERY
*
5.1 Pilot pack.
A pilot pack consisting of
complete and packed unit and intermediate packages, as applicable,
packaged in accordance with Packaging Data Sheet P8413866 to the level
o f protection specified in the contract (see 6.1) and packed level C
s h a l l be forwarded as specified in 3.1.
5 . 2 Reservations packaging, packing, and marking. Rifles with
equipment shall be preserved, unit packaged, packed, and marked in
accordance with the requirements of Packaging Data Sheet P8413866 for
t h e level of protection specified (see 6.1).
5 . 3 R e p a i r p a r t s .  R e p a i r parts shall be prepared for delivery in
a c c o r d a n c e with the applicable packaging data sheets specified in the
c o n t r a c t (see 6.1).
6. NOTES
6 . 1 Ordering data.
Procurement documents should specify the
following:
(a )
T i t l e , number, and date of this specification.
L i s t s of drawings and specifications pertinent to the
(b)
r i f l e , showing applicable revision dates.
I n s p e c t i o n criteria for components (see 4.3.4.4.2.1,
(c )
4.4.2.3.2, 4.4.3.8, 4.4.3.9.3, and 4.5.7.1.1).
I n d e x of inspection equipment lists pertinent to the
(d)
r i f l e , showing applicable revision dates.
N u m b e r of production samples required for tests (see 3.1).
(e )
31

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business