MIL-R-45979
f.
When Government Furnished Acceptance Inspection and Test
Equipment is specified as the method of inspection in the
c o n t r a c t or on the Data Lists, the contractor shall use
inspection equipment fabricated in accordance with the
Government drawing referenced, This requirement takes
precedence over the Inspection Method in Table (see h.
below ).
Where "STM" (Special Test Method) is specified as the
m e t h o d of inspection, the methods and procedures shall
b e as specified.
Alternative inspection methods and inspection equipment
may be used by the contractor when such methods and
equipment equal or exceed the specified accuracy and
provide, as a minimum, the quality assurance required
in the contractual documents.  P r i o r to applying such
a l t e r n a t i v e inspection methods and inspection equipment,
t h e contractor shall describe them in a written proposal
and shall demonstrate, for the approval of the Procuring
C o n t r a c t i n g Officer (PCO), that their effectiveness is
e q u a l to, or better than, the contractual quality
assurance method or equipment.
4.5.7 Acceptance inspection and test equipment. INSPECTION AND
TEST EQUIPMENT USED SHALL BE CAPABLE OF REPEATABLE MEASUREMENTS, BY
VARIOUS EXPERIENCED INSPECTION/TEST PERSONNEL, TO AN ACCURACY OF 10% OF
THE TOTAL TOLERANCE OF THE CHARACTERISTIC BEING INSPECTED.
In the event the contractor desires relief from this requirement for
e l e c t r i c a l testing, a technically supported request for relief or waiver
shall be submitted thru the QAR and the Defense Contract Administration
Services Region (DCASR) to the PCO.
a.
T h e contractor is responsible for providing all
standard measuring and test equipment required.
Required Government designed inspection and test
b.
equipment is shown on Quality Engineering Data List
QE-G-DL7790476 and all documents listed thereon.
T h e contractor is responsible for requisitioning the
c.
Government designed inspection and test equipment
shown as available in the contract.
d.
The Government designed inspection and test equipment
shown as not available in the contract shall be pro-
vided by the contractor in accordance with MIL-I-45607.
This equipment shall be in accordance with the
Government drawings.
T h e contractor is responsible for providing such
e.
q u a n t i t i e s of all inspection and test equipment,
calibrated in accordance with MIL-C-45662, as
r e q u i r e d to support:
14