| ![]() MIL-R-50749(MU)
8 August 1973
and presentation of lots shall be in accordance with inspection and
sampling procedures herein and submission of product provisions of
MIL-STD-105.
4.3.2 Acceptance and rejection. Rejected lots shall be screened
for all defective characteristics. Removal or correction of defective
units and resubmittance of rejected lots shall be in accordance with the
acceptance and rejection criteria specified in MIL-STD-105.
4.3.3 Examination and tests
4.3.3.1 Components and subassemblies. All components and
subassemblies listedin 3.1 shall be inspected in accordance with the
inspection provisions contained in the respective specification, and
SQAPS listed in the technical data package (TDP). In the absence of
SQAPS, the applicable quality assurance provisions of MIL-F-13926
shall apply.
4.3.3.2 First article testing. t article testing shall be
Firs
conducted in" accordance with tables III through VII, except vibration B,
to determine compliance with 4.2. AU examinations and" tests shall be
witnesed by the Government Quality Assurance Representative. When
manufactuting processes, materials, or inspection techniques previously
applied are subject to change, or an adverse change occurs in performance e
capability or reliability of the rangefinder, this shall be cause to cease
those operations contributing to the change or failure until corrections
have been made by the contractor and approved by the Government.
TABLE III
FIRST
ARTICLE INSPECTION
Test Paragraph
Requirements
Characteristics
Item
4.6.25.2
Vibration "A"
3.3.2.3
1
Fungus
4.6.25.9
3.3.2.10
2
Electromagnetic
3
4.6.26
Compatibility
3.3.3
4.6.28
3.3.6
4
Reliability
23
|