Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-60040C -(PA)
MIL-STD-1169 - Packaging, Packing and Marking for
Shipment of Inert Ammunition Components
MIL-STD-1460 - Soldering of Electrical Connections
and Printed Wiring Assemblies, Procedure
For
DRAWINGS
U.S. ARMY PICATINNY ARSENAL
PRODUCT AND PACKAGE DRAWINGS
8860600 - Carton, packing, Ammunition, for Flare Set
9209575 - Flare Rack CY2617/ALA-17
INSPECTION EQUIPMENT DRAWINGS
*9200050 - Vibration Fixture on Y&Z Axis
*9200445 - Operating Instructions for RITA Flare
Rack Assembly Vibration Tests
(Copies of specifications, standards, drawings and publications
required by suppliers in connection with specific procurement
functions should be obtained from the procuring activity or as.
directed by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials shall be in accordance with
applicable drawings and specifications.
3.2 Flare rack assembly. - The fl are rack assembly shall
comp ly with all requirements specified on drawing (dwg) 92)9575
and with all requirements. specified in app licable specifications.
3.4 Insulation resistance. - All circuits shall have
1000 megohms minimum (min) between any two contacts and the
contact and ground upon application of 300 plus 50 volts
direct current.
3.5 Aircraft vibration. - The rack assembly shall meet
the insulation resistance and.continuity requirements after
being subjected to aircraft vibration.  No wire or parts
shall be broken or missing.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business