|
| MIL-R-63997B(AR)
DEFECT
DEFECT
INSP .
REQUIRE-
SAMPLING
NO.
METHOD
MENT
PROCEDURE
Bolt and Bolt Carrier
Gage
3.3.4.2
54.
100%
Improper f i r i n g
Group.
pin protrusion.
Upper Receiver and Barrel
A s s e m b l y Group.
Manual
Handquards.
Failure of
3.3.3.3
100%
55.
handguards to disassemble
and assemble or failure
to be properly retained.
Visual
3.7
100%
Cracks OK
Handguards.
56.
mutilation.
Burrs, cracks
Visual
3.7
100%
Compensator.
57.
or mutilation.
Manual
Insecurely
3.3.3.8
100%
Compensator.
58.
assembled to
rifle.
Manual
Insecurely
100%
3.3.3.4
Front Siqht.
59.
assembled to barrel.
Manual
3.3.3.9
Front Slinq S w i v e l . I n -
100%
60.
securely assembled to
front sight.
F a i l u r e Manual
3.3.3.9
100%
Front Slinq Swivel.
61.
to pivot without binding.
Gage
3.3.3.4
100%
Front Siqht Post Group.
62.
and
Failure of front sight
p o s t t o b e p o s i t i o n e d f l u s h Manual
to not more than .030 inches
below front sight flange
after rifle is zeroed.
Sixteen clicks of downward
travel shall remain after
zeroing.
Rotate sight down-
ward and return to approxi-
This
mate original setting.
inspection may be done during
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |