Click here to make tpub.com your Home Page

Page Title: Barrel Assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-63997B(AR)
REQUIRE-
SAMPLING
INSP .
DEFECT
DEFECT
MENT
PROCEDURE
METHOD
NO.
pre-function  check  in  order
not  to  disrupt  zero  setting
obtained  during  target  and
(See
accuracy  test  firing.
4.7.6.)
100%
3.7
Visual
Burrs or
Front  Sight.
63.
deformation.
100%
3.6 and
Visual
Illegible
Front  Sight.
64.
Drawing
Missing
marking.
MIL-L-46000.
100%
3.3.3.4
Gage
Failure  to
Front  Siqht.
65.
meet approved functional
bayonet  gages.
3.3.3.2
Manual
66.
Gas Tube. Failure to
100%
securely assemble gas
tube so there is no re-
lative  movement  between
gas tube and front sight.
100%
3.3.3.2
Manual
Failure  to  align
Gas Tube.
67.
properly  with  carrier  key.
100%
3.3.3.2
Visual
Mutilation.
Gas Tube.
68.
100%
3.3.3.1
Visual
Pockets,
Barrel  Assembly.
69.
rings,  bulges  or  other
deformations in bore or
Particular  at-
chamber.
tention shall be given
muzzle compensator
shoulder area of bore
for rings or bulges.
100%
3.7
Visual
Burrs,
Barrel  Assembly.
70.
cracks  or  mutilation
of  bolt  locking  lugs.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business