|
| IL-R-81202D(AS)
(2.) Increase pressure uniformly to 4000 +/-250 psig.
(3.) Exhaust uniformly to 225 +/-50 psig.
3.8 Precedence. The selection of specifications and standards for use in
the design and development shall be in accordance with the requirements of
MIL-STD-143. When the requirements, this specification, and referenced docu-
ments are in conflict, the following precedence shall apply:
a.
This specification. This specification shall have precedence over
all referenced documents.
b.
Referenced documents. Any documents referenced in this specifica-
tion shall have precedence over all subsidiary documents referenced
therein.
3.9 Workmanship. The workmanship displayed in fabrication and assembly of
the receiver assembly shall be such as to assure, within design limitations,
ability of the receiver assembly to meet their performance requirements under
all applicable environmental conditions specified herein. Particular atten-
tion shall be paid to neatness and thoroughness of assembly, marking of parts
and assemblies, plating, painting, machining, welding, brazing and freedom of
parts from burrs and sharp edges. The standards of workmanship exhibited in
the approved first article sample, subject to any qualification stated in the
government's notice of approval, shall determine the requirements of the re-
mainder of the contract relative to workmanship.
4.
QUALITY ASSURANCEE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the con-
tract, the contractor is responsible for the performance of all inspection re-
quirements as specified herein. Except as otherwise specified in the contract,
the contractor may use his own or any other facilities suitable for the per-
formance of the inspection requirements specified herein, unless disapproved by
the Government. The Government reserves the right to perform any of the in-
spections set forth in the specification where such inspections are deemed nec-
essary to ensure that the supplies and services conform to prescribed require-
ments.
4.2 Classification of inspection.
The inspection of the receiver assemblies
shall be classified as follows:
a.
First article inspection (see 4.4).
b.
Quality conformance inspection (see 4.5).
10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |