| ![]() MIL-R-81202D(AS)
1/
TABLE II.
First article inspections - schedule and sequence- .
Test
Test
Sample
Test
Title
requirement
method
paragraph
paragraph
A
B
C
D
E
Radiographic inspec-
4.6.1
A
3.7.1
1
1
1
1
1
2/
tion-
B
3.7.2
4.6.2
2
2
2
2
2
Permanent volumetric on
expansi 3/
C
Inspection
3.7.3
4.6.3
3
3
3
3
3
D
Cleanliness
3.7.4
4.6.4
4
4
4
4
4
E
Proof pressure
3.7.5.1
4.6.5.1
5
5
5
5
5
Leakage
F
4.6.5.2
6
6
6
6
6
3.7.5.2
G
Operating pressure
3.7.5.3
4.6.5.3
7
7
7
7
7
H
High temperature
4.6.6.1
3.7.6.1
8
x
x
x
x
I
Low temperature
4.6.6.2
3.7.6.2
9
x
9
x
x
4.6.6.3
Thermal shock
J
3.7.6.3
x
8
x
8
x
K
Salt fog
4.6.6.4
3.7.6.4
9
x
9
x
x
Humidity
L
4.6.6.5
3.7.6.5
x
10
x
10
x
Vibration
M
3.7.6.6
4.6.6.6
10
x
10
x
x
N
Impact
4.6.6.7
x
x
3.7.6.7
x
11
x
Burst pressure 4/
3.7.7
4.6.7
O
11
x
x
x
x
4.6.8
P
Service life-
3.7.8
x
11
x
x
x
1/
- Test sequence is denoted by the numbers in the sample columns. An X
denotes test not required.
2/
- Radiographic inspection shall be performed by the contractor prior to
filament winding. This test will not be conducted by the government
approved test laboratory unless directed by the procuring activity (see
6.2.1).
-/ Permanent volumetric expansion shall be performed by the contractor prior
3
to mounting components. This test will not be conducted by the govern-
ment approved test laboratory unless directed by the procuring activity
(see 6.2.1).
4/
- Receiver assemblies subjected to life tests shall not be subjected to
the burst test.
for ease of identification and shall be produced with the equipment and pro-
cedures that will be used for the production of all receiver assemblies desig-
nated in the contract or purchase order. Prior to submission, the contractor