Quality conformance inspections - schedule and sequence- .
TABLE III.
Test
Test
Sample
method
Test
requirement
paragraph
paragraph
ALL SAMPLES
GROUP 1
2/
1
4.6.1
Radiographic inspection-
3.7.1
2
3.7.2
4.6.2
volumetric
Permanent
3/
expansion-
3
4.6.3
3.7.3
Inspection
4
3.7.4
4.6.4
Cleanliness
4.6.5.1
5
Proof pressure
3.7.5.1
6
4.6.5.2
Leakage
3.7.5.2
7
4.6.5.3
Operating pressure
3.7.5.3
4/
A
B
C
D
GROUP 2-
3.7.6.1
4.6.6.1
1
x
1
x
High temperature
4.6.6.2
2
x
2
x
3.7.6.2
Low temperature
4.6.6.3
Thermal shock
3.7.6.3
x
1
x
1
4.6.6.4
x
2
x
2
3.7.6.4
Salt fog
4.6.6.5
x
3
x
3
3.7.6.5
Humidity
3.7.6.6
4.6.6.6
3
x
3
x
Vibration
4.6.6.7
x
x
x
4
Impact
3.7.6.7
4.6.7
x
x
4
x
3.7.7
Burst pressure
5/
4.6.8
x
4
x
x
Service life-
3.7.8
Test sequence is denoted by the number in the sample columns. An X
denotes tests not required.
Radiographic inspection shall be performed by the contractor prior
to filament winding. This test will not be conducted by the government
approved test laboratory unless directed by the procuring activity (see
6.2.1).
Permanent volumetric expansion shall be performed by the contractor prior
to mounting components. This test will not be performed by the
government approved test laboratory unless directed by the procuring
activity (see 6.2.1).
The procuring activity shall decide which tests of Table III, Group 2,
each additional receiver assembly in excess of four shall receive (see
6.2.1).
Receiver assemblies subjected to life tests shall not be subjected to
the burst test.