MIL-R-81939B(AS)
l.
Number and designation of impulse cartridges required for testing (see 4.6.3 and 4.6.8.1).
Contract provision. Contracts shall specify the following provision for first article
6.2.2.
inspection,
First article. When a first article is required for inspection and approval (see 3.1,4.3,
6.2.2.1
6.2 and 6.3), the contract shall specify the following provision for first article inspection. When a
contractor is in continuous production of bomb racks from contract to contract, consideration should be
given to waive the first article inspections. If inspection is required, indicate:
If first article inspections are conducted at the contractor's plant or a government approved
a.
laboratory, an inspection report shall be forwarded to the procuring activity for verification.
That the approval of first article samples or the waiving of the first article inspection shall
b.
not relieve the contractor of his obligation to fulfill all other requirements of the specification
and contract.
Contract data requirements. When this specification is used in a procurement which
6.3
incorporates a DD Form 1423 and invokes the provisions of 7-104.9(n) of the Armed Services Procure-
ment Regulations, the data requirements identified below will be developed as specified by an approved
-
Data Item Description (DD Form 1664) and delivered in accordance with the approved Contract Data
Requirements List (DD Form 1423) incorporated into the contract. When the provisions of ASPR-
7-104.9(n) are not invoked, the data specified below will be delivered by the contractor in accordance with
the contract requirements. Deliverable data required by this specification is cited in the following para-
graphs:
Applicable DID
Data Requirement
Paragraph
DI-T-5329-Inspection
4.3
First Article Inspection
Reports
Test Reports
DI-T-5329 - Inspection
Quality Conformance
4.4
Test Reports
Inspection Reports
(Copies of data item descriptions required by the contractors in connection with
specific procurement functions should be obtained from the procuring activity or as directed by the
contracting officer.)
Quality assurance definitions. Definitions for quality assurance terms are in accordance
6.4
with MIL-STD-109.
Preparing Activity
NAVY-AS
DOD Proj. No. 1095-NO97