Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-R-81965A(AS)
workmanship exhibited in the approved first article sample, subject to any qualification stated in the
government's notice of approval, shall be determinative of the requirements of the contract relative to
workmanship.
QUALITY ASSURANCE PROVISIONS (See 6.4)
4.
4.1
Responsibility for inspection. Unless otherwise specified in the contract, the contractor
is responsible for the performance of all inspection requirements as specified herein. Except as otherwise
specified in the contract, the contractor may use his own or any other facilities suitable for the performance
of the inspection requirements specified herein, unless disapproved by the government. The government
reserves the right to perform any of the inspections set forth in the specification, where such inspections are
deemed necessary to assure that the supplies and services conform to prescribed requirements.
4.2
Classification of inspection. The inspection of the bomb racks shall be classified as
follows:
First article inspection (see 4.3)
a.
Quality conformance inspection (see 4.4)
b.
First article inspection. First article inspection shall consist of all of the inspections
4.3
listed in Table I. First article inspection report format shall be in accordance with MIL-STD-831 (see
6.3).
4.3.1
Sampling for first article inspection. First article bomb rack samples shall consist of the
first two bomb racks manufactured on contract. The bomb racks shall be permanently labeled A and B for
case of identification, Failure of the bomb racks to pass any of the first article inspections shall be cause
for rejection (see 6.3).
4.4
Quality conformance inspection. Quality conformance inspection shall consist of the
following inspections:
a.
Individual Inspections (see 4.4.1)
Sampling Inspections (see 4.4.2)
b.
Quality conformance inspection report format shall be in accordance with MIL-STD-831 (see 6.3).
Individual inspections. Individual inspections are those inspections conducted on each
4.4.1
bomb rack. Individual inspections for the bomb racks are shown in Table II, Group 1. Failure to pass any
of these inspections shall be cause for rejection of the bomb rack.
4.4.2
Sampling inspections. A random sampling of the bomb racks shall be selected by the
procuring activity from each production lot in accordance with Table III and shall be subjected to the
inspections listed in Table II. Group I and Group 2. Group 1 inspections shall be conducted prior to Group
2 inspections. Failure to pass any of these inspections shall be cause for rejection of the entire lot (see 6.2.1f
and 6.3).
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business