|
| MIL-R-85323(AS)
2.2
Order of precedence of specifications and standards.
Should a conflict exist between any requirement in this specification
and any requirement in the applicable documents referenced herein, the
requirements of this specification shall take precedence over the refer-
enced (applicable) document.
REQUIREMENTS
3.
The bomb racks furnished under this
First article.
3.1
specification shall be a product which has been inspected and passed the
first article inspection specified herein (see 4.3).
Specifica-
Selection of specifications and standards.
3.2
tions and standards for necessary commodities and services not specified
herein shall be selected in accordance with MIL-STD-143.
All parts having the same part
Interchangeability.
3.3
number shall be directly and completely interchangeable with each other
with respect to installation and performance.
All parts shall be marked as
Identification of parts.
3.4
specified on the drawings listed in the data list for the bomb rack
being procured, or in accordance with MIL-STD-130, if not specified on
the drawings. The item identification and part number requirements of
MIL-STD-100 shall govern the part number and changes thereto.
q
Materials. Materials shall be as specified on the draw-
3.5
ings listed
in the data list for the bomb rack being procured (see
6.2.1f).
Bomb rack.
3.6
Construction. The construction of the bomb rack shall be
3.6.1
in accordance with the drawings listed in the data list for the bomb
rack being procured and as specified herein (see 6.2.1f).
The bomb racks shall satisfy all perform-
Performance.
3.6.2
ance requirements when subjected to the following inspections in the
order specified in Tables I and II.
Bomb Rack Inspection (see 4.6.1)
a.
b.
Functional Test (see 4.6.2)
Arming Mechanism (see 4.6.3)
c.
Electric Fuze Arming (see 4.6.4)
d.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |