| MIL-R-85323(AS)
e.
Life (see 4.6.5)
f.
Electrical Characteristics (see 4.6.6a)
Lag Time
or Time of Release Determination
(see
g.
4.6.6b)
h.
Icing (see 4.6.6c)
i.
Temperature Shock (see 4.6.6d)
Altitude (see 4.6.6e)
j.
k.
Humidity (see 4.6.6f)
l.
Sand (see 4.6.6g)
m.
Salt Spray (see 4.6.6h)
n.
Shock (see 4.6.6i)
o.
Vibration (see 4.6.6j)
Lock Shut Firing (see 4.6.6k)
p.
Static (see 4.6.61)
q.
Workmanship.
The workmanship displayed in fabrication
3.7
and assembly of the bomb racks shall be such as to assure, within design
limitations, the ability of the bomb racks to meet their performance
requirements under all applicable environmental conditions specified
herein. Unauthorized repair, welding, heavy burrs, or parts assembled
by introduction of high stresses not prescribed in the drawings, are
typical signs of inferior workmanship and shall be cause for rejection.
The standards of workmanship exhibited in the approved first article
sample, subject to any qualification stated in the government's notice
of approval, shall be determinative of the requirements of the contract
relative to workmanship.
4.
QUALITY ASSURANCE PROVISIONS
4.1
Responsibility for inspection.
Unless otherwise speci-
fied in the contract, the contractor is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified in the contract, the contractor may use his own or any other
facilities suitable for the performance of the inspection requirements
specified herein, unless disapproved by the government. The government
reserves the right to perform any of the inspections set forth in the
specification, where such inspections are deemed necessary to assure
that the supplies and services conform to prescribed requirements.
4
|