|
| MIL-R-85323(AS)
(Type I bomb rack) or the J13 connector (Type
II bomb rack).
Remove the voltage from pin 8 of connector J1.
3.
4.
Remove the test voltage from pin 4 and pin 7 of
connector J1 and then reapply.
The stepper
switch shall automatically home to station
number 1 (centerline ejector unit on the Type I
bomb rack, aft centerline ejector unit on the
Type II bomb rack).
Repeat steps 2, 3, and 4 two additional times.
5.
Remove all voltages from connector J1.
6.
c.
Check the store release circuits. The forward hooks
shall be closed on all ejector units.
1.
Apply the test voltage to pin 4 (positive) and
pin 7 (ground) of connector J1.
2.
Apply the test voltage to pin 8 of connector
J1. Voltage shall exist between the center
contact and ground of the J7 connector (Type I
bomb rack) or the J13 connector (Type II bomb
rack).
Remove the test voltage from pin 8 of connector
3.
J1.
Repeat this procedure to check the proper
4.
sequencing of the test voltage to all ejector
units. The firing order shall be as follows:
Type I Bomb Rack
Type II Bomb Rack
Center station (J7
Center aft station (J13
connector)
connector)
Left station (J6
Center forward station
connector)
(J12 connector)
Right station (J5
Left aft station (Jll
connector)
connector)
Left forward station (J10
connector)
Right aft station (J9
connector)
Right forward station
(J8 connector)
12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |