| MIL-R-85323(AS)
The stepper switch shall automatically home to station 1 after applica-
tion of the firing pulses.
3 and 4 two additional
Repeat steps 1, 2,
5.
times.
Remove all voltages from connector J1.
6.
The
Check the rocket and CBU firing circuits.
d.
forward hooks shall be closed on all ejector units.
Apply the test voltage to pin 4 and pin 7 of
1.
connector J1.
Apply the test voltage to pin 6 (positive) of
2.
connector J1 (the select rockets relay shall be
energized).
Apply the test voltage to pin 8 of connector
3.
J1. Voltage shall exist between pins A and E of
connector J4 (Type I bomb rack) or connector J7
(Type II bomb rack).
4.
Remove the voltage from pin 8 of connector J1.
Repeat steps 3 and 4 to check the proper sequen-
5.
cing of the test voltage to all rocket and CBU
firing circuits. The order shall be as follows:
Type II Bomb Rack
Type I Bomb Rack
Center aft station (J7
Center station (J4
connector)
connector)
Center forward station
Left station (J3
(J6 connector)
connector)
Left aft station (J5
Right station (J2
connector)
connector)
Left forward station (J4
connector)
Right aft station (J3
connector)
Right forward station (J2
connector)
Remove all voltages from connector J1.
6.
7.
Repeat steps 1 through 6 two additional times.
13
|