| MIL-R-85323(AS)
TABLE II.
1/
Quality conformance inspections - schedule and sequence.
Sample
Tests
Test paragraph
A
C
D
B
All samples
Group 1
1
Bomb rack inspection
4.6.1
4.6.2
2
Functional 2/
Arming mechanism
4.6.3
3
4.6.4
4
Electric fuze arming
Group 2
A
B
C
D
4.6.6a
1
x
1
Electrical characteristics
Lag time or time of release
determination
4.6.6b
x
1
x
4.6.6c
x
Icing
2
x
Temperature shock
4.6.6d
x
3
x
4.6.6e
Altitude
x
4
X
4
Humidity
4.6.6f
x
5
x
5
Sand
4.6.6g
x
6
X
6
Life
4.6.5
x
7
x
7
Salt spray
4.6.6h
x
8
x
8
Shock
4.6.6i
2
x
2
x
Vibration
4.6.6j
3
x
3
x
4.6.6k
x
Lock shut firing
9
x
9
Static
4.6.6l
4
x
4
x
--/
1
Inspection sequence is denoted by the numbers in the sample columns.
An X denotes inspection not required.
2/
The vibration requirement is applicableonly during individual inspec-
tion tests performed by the contractor.
28
|