|
| MIL-R-85323(AS)
Sampling test items.
TABLE III.
Production
Number of samples
Lot size
2
100 or less
Bomb racks
3
101 - 200
4
201 - 300
301 or More
The procuring activity shall specify the number of samples, and the
sequence of inspections each unit shall be subjected to for lots in
excess of 300 units (see 6.2.le).
Applied shock yield loads.
TABLE IV.
Applied shock load (g's) for
113 kilogram (250 pound) store
Direction
17.3
Vertical up
17.3
Vertical down
8.6
Transverse port
8.6
Transverse starboard
10.3
Longitudinal forward
10.3
Longitudinal aft
29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |