|
| MIL-R-85523A(AS)
Sample submitted by (name), (date) for qualification inspection in
accordance with the requirements of MIL-R-85523A(AS)
Number under authorization (reference authorizing letter and number)
(see 6.4).
4.3.2 Retention of qualification. The retention of qualification shall
consist of periodic verification to determine compliance of the qualified
regulator with the requirements of this specification. The time and method of
periodic verification shall be specified by the activity responsible for the
Qualified Products List and shall be included in the Notice of Qualification
letter.
4.4 First article inspection. First article inspection shall be as
specified in Table VIII, in the order specified.
4.4.1 First article samples. Unless otherwise specified, as soon as
practicable, after award of the contract or purchase order, the manufacturer
shall submit four complete regulators and three elastomer slabs. The elastomer
slabs shall be 6 by 6 by 0.075 inch and composed of the identical ozone resistant
composition and cure that was used in manufacturing the elastomer components.
The samples shall be representative of the construction, workmanship, components
and materials to be used during production. When a manufacturer is in continuous
production of these units from contract to contract, submission of further first
article samples on a new contract may be waived at the discretion of the
acquisition activity (see 6.2d). Approval of the first article samples or the
waiving of the first article inspection does not waive the requirements of
submitting to the quality conformance inspection. The first article inspection
samples shall be furnished to the Government as directed by the contracting
officer (see 6.2e).
4.4.2 First article information. Upon completion of the first article
inspection, all the applicable inspection reports, recommendations and pertinent
comments will be forwarded by the Government activity responsible for the
inspection program (see 6.2e) to the contracting activity. Disposition of
samples shall be as follows:
a. One approved sample will be initially returned to the contractor for use
in monitoring production.
b. One approved sample will be retained by the test facility for reference
during quality conformance verification and shall be returned to the
contractor with samples from the final production lot.
c. The remaining samples will be consumed or destroyed during the inspection
program and shall not be considered as part of the quantity to be
delivered under the acquisition document.
4.5 Quality conformance inspection. The sampling and inspection levels and
the acceptance criteria shall conform to MIL-STD-105 and Table I. Quality
conformance inspection shall be as specified in Table I, in the order specified.
4.5.1
Sampling.
4.5.1.1
Inspection lot.
10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |