|
| MIL-R-85895 (AS)
The linear actuator shall be in accordance with
3.6.2 Linear Actuator.
MIL-A-85046.
Two mechanical fuze arming units
3.6.3 Mechanical Fuze Arminq Unit.
shall be in accordance with MIL-A-85836.
Electrical fusing shall be in
Unit.
Electrical Fuze Arming
3.6.4
accordance with MIL-C-81841.
All electrical wiring shall be in accordance with MIL-W-
3.6.5 Wirinq.
5088.
The bomb
rack shall meet the design
3.7 Electrical Bondinq.
requirements of MIL-B-5087.
3.8 Workmanship. The workmanship displayed in fabrication and assembly
of the bomb racks shall be such as to assure, within design limitations,
the ability of the bomb racks to meet their performance requirements
under all applicable environmental conditions specified herein. The
standards of workmanship exhibited in the approved first article sample,
subject to any qualification stated in the government's notice of
approval, shall determine the requirements of the contract relative to
workmanship (see 4.6.1).
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the
performance of all inspection requirements as specified herein. Except
as otherwise specified in the contract or purchase order, the contractor
may use his own or any other facility suitable for the performanance of
the inspection requirements specified herein, unless disapproved by the
The-government reserves the right to perform any of the
government.
inspection set forth in this specification, where such tests are deemed
necessary to assure that the supplies and services conform to prescribed
requirements.
All items must meet all
Responsibility for compliance.
4.101
requirements of sections 3 and 5. The inspection set forth in this
specification shall become a part of the contractor's overall inspection
The absence of any inspection requirements
system or quality program.
in the specification shall not relieve the contractor of the
responsibility of assuring that all products or supplieS submitted tO
the Government for acceptance comply wit all requirements of the
contract. Sampling in quality conformance does not authorize submission
of known defective material, either indicated or actual, nor does it
commit the Government to acceptance of defective material.
The inspection
requirements
4.2 Classification of inspections
specified herein are classified as follows:
5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |