Click here to make tpub.com your Home Page

Page Title: Requirements for parts.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-85895 (AS)
The bomb rack shall meet the performance
3.5.2
Performance.
requirements  when  subjected  to the following test in the order
specified in Tables I and II.
Bomb rack inspection (see 4.6.1)
a.
b.
Functional (see 4.6.2)
c.
Arming unit (see 4.6.3)
Electric fuze arming (see 4.6.4)
d.
Manual operation (see 4.6.5.1)
e.
f.
Electrical characteristics (see 4.6.5.2)
Electromagnetic compatibility (see 4.6.5.3)
g.
Lag time determination (see 4.6.5.4)
h.
i.
Icing (see 4.6.5.5)
Shock (see 4.6.5.6)
j.
Vibration (see 4.6.5.7)
k.
Sand (see 4.. 6.5.8)
l.
m.
Temperature shock (see 4.6.5.9)
n.
High-g (see 4.6.5.10)
Life (see 4. 6.5.11)
o.
Stress corrosion (see 4.6.5.12)
p.
Humidity (see 4.6.5.13)
q.
r.
Fungus (see 4.6.5.14)
s.
Lock shut firing (see 4.6.5.15)
t.
Static test (see 4.6.5.16)
u.
Salt spray/altitude (see 4.6.5.17)
3.6 Requirements for parts.
3.6.1 Hooks.  The construction and inspection of the hooks shall
be in accordance with MIL-H-85042.  Prior to installation into
bomb racks, the hooks shall have met all of the first article and
sampling requirements of MIL-H-85042.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business