| MIL-R-85895 (AS)
The bomb rack shall meet the performance
3.5.2
Performance.
requirements when subjected to the following test in the order
specified in Tables I and II.
Bomb rack inspection (see 4.6.1)
a.
b.
Functional (see 4.6.2)
c.
Arming unit (see 4.6.3)
Electric fuze arming (see 4.6.4)
d.
Manual operation (see 4.6.5.1)
e.
f.
Electrical characteristics (see 4.6.5.2)
Electromagnetic compatibility (see 4.6.5.3)
g.
Lag time determination (see 4.6.5.4)
h.
i.
Icing (see 4.6.5.5)
Shock (see 4.6.5.6)
j.
Vibration (see 4.6.5.7)
k.
Sand (see 4.. 6.5.8)
l.
m.
Temperature shock (see 4.6.5.9)
n.
High-g (see 4.6.5.10)
Life (see 4. 6.5.11)
o.
Stress corrosion (see 4.6.5.12)
p.
Humidity (see 4.6.5.13)
q.
r.
Fungus (see 4.6.5.14)
s.
Lock shut firing (see 4.6.5.15)
t.
Static test (see 4.6.5.16)
u.
Salt spray/altitude (see 4.6.5.17)
3.6 Requirements for parts.
3.6.1 Hooks. The construction and inspection of the hooks shall
be in accordance with MIL-H-85042. Prior to installation into
bomb racks, the hooks shall have met all of the first article and
sampling requirements of MIL-H-85042.
4
|