MIL-R-85895 (AS)
Number of  samples and inspection sequence for production lots
e.
in excess of 300 units (see Table III).
Inspection sequence for hooks (see 3.6.1).
f.
Drawing package for the bomb rack (see 3.5.1).
g.
Applicable maintenance manuals for the bomb rack.
h.
Name and location of government representative responsible for
i.
random selection of test samples (see 4.4.2).
Name and location of government approved test laboratory.
j.
Number  and designation of impulse cartridges required for
k.
testing (see 4.6.2 and 4.6.5).
responsible for
Name  and  location  of  government
activity
l.
supplying arming wire assemblies (see 4.6.3).
When  this  specification  is used in a
Data  requirements.
6.2.2
procurement which incorporates DD Form 1423 and invokes the provisions
of DOD FAR Supplement, Part 27, Sub-Part 27.410-6, the data requirements
identified below will be developed as specified by an approved data Item
Description (DD Form 1664)and delivered in accordance with the approved
Contract Data Requirements List (CDRL).  When the provisions of the DOD
FAR Supplement,  Part 27,  Sub-Part 27.410-6 are not involved, the data
specified below will be delivered by the contractor  in accordance with
required by this
Deliverable data
requirements.
the contract
specification is cited in the following paragraphs:
Applicable DID No. Option
Data Requirement Title
Paraqraph No.
DI-T-5329
Inspection and Test
4.3
Reports
DI-T-5329
Inspection and Test
4.4
Reports
shall specify the following
The contract
6.3 Contract provision.
provision for first article inspection.
When a first article inspection is required for
First article.
6.3.1
testing and approval (See 3.1, 4.3, 6.2 and 6.3), the contract should
specify the  following provision  for first article inspection. When a
contractor is in continuous  production of bomb racks from contract to
contract,  consideration  should  be  given  to waive the first article
inspection.  If testing is required, indicate:
If first article inspection  is conducted  at the contractor's
plant or  a government  approved laboratory an inspection report should
be forwarded to the procuring activity for verification.