| MIL-R-85895 (AS)
TABLE II - Quality Conformance Inspection - SCHEDULE AND SEQUENCE 1/
TEST
SAMPLE
PARAGRAPH
TESTS
ALL SAMPLES
Group 1
1
4.6.1
Bomb Rack Inspection
2
4.6.2
Functional
3
4.6.3
Arming Unit
4
4.6.4
Electric Fuze Arminq
D
B
A
C
Group 2
1
X
1
X
4.6.5.1
Manual Operation
2
1
2
1
4.6.5.2
Electrical Characteristics
3
x
3
x
4.6.5.3
Electromagnetic Compatibility
4
x
x
2
4.6.5.4
Lag Time Determination
5
X
X
X
4.6.5.5
Icing
X
2
X
X
4.6.5.6
Shock
X
3
X
X
4.6.5.7
Vibration
6
X
X
X
4.6.5.8
Sand
x
x
x
4
4.6.5.9
Temperature Shock
7
x
4
x
4.6.5.10
High-g
8
X
X
3
4.6.5.11
Life
9
X
X
X
4.6.5.12
Stress Corrosion
X
5
X
X
4.6.5.13
Humidity
x
6
X
X
4.6.5.14
Fungus
10
x
5
x
4.6.5.15
Lock Shut Firing
x
7
x
4
4.6.5.16
Static Test
x
8
X
5
4.6.5.17
Salt Spray/Altitude
Inspection sequence is denoted by the numbers in the sample
l/
columns. An X denotes test not required.