TABLE I - First Article Inspections - SCHEDULE AND SEQUENCE 1/
TEST
SAMPLE
PARAGRAPH
A
B
TESTS
Bomb Rack Inspection
4.6.1
1
1
Functional Test
4.6.2
2
2
Arming Unit
4.6.3
3
3
Electrical Fuzing Arming
4.6.4
4
4
Manual Operation
4.6.5.1
5
x
4.6.5.2
Electrical Characteristics
6
5
Electromagnetic Compatibility
4.6.5.3
7
x
Lag Time Determination
4.6.5.4
8
x
Icing
4.6.5.5
9
x
v
4.6.5.6
Shock
10
Vibration
4.6.5.7
x
6
Sand
4.6.5.8
11
x
Temperature Shock
4.6.5.9
x
7
12
High-g
4.6.5.10
x
Life
4.6.5.11
13
x
Stress Corrosion
4.6.5.12
14
x
Humidity
4.6.5.13
x
8
Fungus
4.6.5.14
x
9
Lock Shut Firing
4.6.5.15
15
x
Static Test
4.6.5.16
x
10
4.6.5.17
x
11
Salt Spray/Altitude
the sample
Inspection sequence is denoted by the
numbers
in
1/
columns. An x denotes test not required.
15
|