4.4.3 Testing of the end product.- Each production unit shall be tested
in accordance with 4.5.1 with no evidence of failure. In addition, when a
preproduction sample is not required, the initial production unit shall be
tested in accordance with 4.5.2, with no evidence of failure.
4.4.4 Examination of preparation for delivery.- Examination shall be
made to determine that preservation, packaging, packing, and marking re-
quirements of section 5 of this specification are complied with. Any
deviation from specified requirements shall be cause for rejection.
4.5 Tests.-
4.5.1 Operational test.- Type V machines shall be tested in accordance
with OO-S-256. Types I, II, IV, and VII machines shall be operationally
tested for not less than 10 minutes. Electrically operated machines shall
be connected to a power source having characteristics similar to those
specified. The test shall be conducted with actual material or items of
use and shall include the accomplishment of all the shoe repair operations
for which the machine was designed and shall meet the requirements specified
in 3.5.
4.5.2 Electromagnetic compatibility tests.- When electromagnetic com-
patibility is required, the preproduction sample or initial unit of
production shall be tested by the supplier in accordance with test
methods CE03 and RE02 of MIL-STD-462. The Government reserves the
right to witness tests performed by the supplier or his private testing
organization. The supplier shall furnish the Contracting Officer for
approval the Interference Control Plan, the EMI/EMC Test Plan and the
Electromagnetic Compatibility Test Report required by MIL-STD-461. Upon
approval of the test report by the Contracting Officer and provided all
other requirements of the specification are met, the preproduction sample
or initial unit of production as applicable, shall be used as a model for
all production units.
PREPARATION FOR DELIVERY
5.
5.1 Preservation and packaging.- Preservation and packaging shall be
level A or C as specified (see 6.2).
5.1.1 Level A.- Type V machines shall be preserved and packaged in
accordance with the level A requirements of OO-S-256. All other types
shall be preserved and packaged as specified herein. Preservation shall
be in accordance with material and method requirements of MIL-P-116, as
hereinafter specified.
5.1.1.1 Disassembly.- All projecting, detachable components shall be
disassembled from the equipment when such will reduce the cube of the pack
or is required to prevent damage to the equipment. Projecting, disassembled
|