Click here to make tpub.com your Home Page

Page Title: Hot temperature
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-13261G(AR)
TABLE III
Defect
Classifiaction
Premature burst (See 3.4.1)
Critical
Incorrect color (See Dwgs 8797956 & 8839489)
Critical
Burning time incorrect (See 3.4.2
Major
Altitude less than min at ambient temperature
(See 3.4.4b)
Major
Angle from vertical greater than 30 degrees
at ambient temperature (See 3.4.4b)
Major
Average altitude under min at ambient
temperature (See 3.4.4c)
Major
Average angle from vertical over max at
ambient temperature (See 3.e.4d)
Major
Average angle from vertical over max at
Major
cold temperature (See 3.4.5b)
Major
Signal fails to function (See 3.4)
Assembly bursts at distance of more than one
hundred (100) feet from launcher (See 3.4.1)
Major
Cork sealing disc in end of barrel loose (See
(label dwgs. 8797931-1, -6, -7)
Major
4.4.3.2.1 Hot temperature.
4.4.3.2.1.1  Beginning with the first lot produced and
continuing until three (3) consecutive lots have complied with the
acceptance criteria specified, one hundred (100) assemblies shall be
selected for test.  The lot shall be rejected if any signal assembly
shows evidence of a critical defect during the test.
4.4.3.2.1.2 After three (3) consecutive lots have complied with
the criteria of 4.4.3.2.1.1, twenty-five (25) assemblies shall be
selected from each lot for test.  The lot shall be rejected if any
signal assembly shows evidence of a critical defect during the test.
Ambient temperature.
4.4.3.2.2.
4.4.3.2.2.1 Beginning with the first lot produced and
continuing until three (3) consecutive lots have complied with the
acceptance criteria specified, one hundred and twenty-five (125)
assemblies shall be selected from each lot for test.  The lot shall
be rejected if during the test, a critical defect occurs, the
average angle from the vertical exceeds the requirement, the average
altitude is less than the requirement, or if eight (8) or more
assemblies exhibit any of the remaining major defects listed in
Table III.
32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business