Click here to make tpub.com your Home Page

Page Title: Submission of designs for approval
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-13303G(AR)
6.3 Submission of designs for approval.  Contractor designs
shall be approved by the Government prior to fabrication or
procuring the equipment.  Designs shall be submitted for approval to
ARDC, DRSMC-QAT-I (D), Dover, New Jersey 07801 in accordance with
the stipulations, time frame and distribution specified in the
Contract Data Requirements List (DD Form 1423) or in the contract.
Partical submission of inspection equipment designs is permissible
and encouraged.  However, the completion date for design review will
be based on the date of the final submission of designs. ARDC
design review will normally be accomplished within one month after
receipt.
6.4 Alternate test methods.  Prior approval of the Contracting
Officer is required for use of equivalent test methods. A
description of the proposed method should be submitted thru the
Contracting Officer to:  Commander, US Army Armament Research and
Development Center, ATTN:  DRSMC-QAT-I(D), Dover, New Jersey
07801.  This description should include but not be limited to the
procedures used, the accuracy and precision of the method, test data
to demonstrate the accuracy and precision and drawings of any
special equipment required.
6.5 Hand firing.  Personnel hand firing signals after cold
temperature conditioning should wear protective gloves and other
suitable protective clothing.
6.6 Drawings.  Drawings listed in Section 2 of this
speci fi cation under the heading "US ARMY ARMAMAMENT RESEARCH AND
DEVELOPMENT CENTER (ARDC)" may also include drawing prepared by and
identified as US Army Armament Research and Development Command
(ARRADCOM), Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal
or Picatinny Arsenal drawings.  Technical data originally prepared
by these activities is now under cognizance of ARDC.
6.7 Changes from previous issue.  Asterisks are not used in
this revision to identify changes with respect to the previous
issue, due to the extensiveness of the changes.
Custodian:
Preparing activity:
Army-AR
Army-AR
(Project
1370-A173)
47

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business