|
| MIL-S-1398E(AR)
4.4.3.2.2 After three (3) consecutive lots. After three
consecutive lots have complied with the acceptance criteria
4.4.3.2.1, eighty (80) signal assemblies shall be selected from each
lot for test. The lot shall be rejected if any defect as classified
in Table III occurs.
4.4.3.3 Functioning. The signal assemblies shall be observed
for any evidence of failure to comply with the requirements as
classified in Table IV when tested as specified in 4.5.3.
TABLE IV - Defect Classification
Classification
Defect
Critical
Star color incorrect (see dwg. 8847461)
Critical
Star bursts in pistol (see 3.5.1)
Critical
One star fails to ignite (see 3.5.5)
Major
Case sticks in barrel (see 3.5.2)
Major
Primer fails to function (see 3.5.3)
Star intensity and ignition time over max.
Major
(see 3.5.6)
Detached composition burning time over
Major
max. (see 3.5.6)
Major
Altitude below min. (see 3.5.4)
Star burning time below min. (See dwg.
Major
8847461)
4.4.3.3.1 First three (3) lots. Two hundred forty (240) signal
assemblies selected and tested in accordance with 4.4.3.2.1 shall be
function tested in accordance with 4.5.3. The lot shall be rejected
if a Critical defect occurs or if eight (8) or more Major defect are
found during the test (see Table IV).
4.4.3.3.2 After three (3) consecutive lots. The eighty (80)
signal assemblies selected and tested in accordance with 4.4.3.2.2
shall be tested for functioning in accordance with 4.5.3. The lot
shall be rejected if a Critical defect occurs or if four (4) or more
Major defect are found during the test (see Table IV).
25
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |