| MIL-S-18471G(AS)
d.
Preliminary data from instrumentation records and traces,
including available video coverage.
Recommendations.
e.
4.7.3.2 Interim reports. Within 20 days following the completion of
each test of DT-IB and DT-IIB, and each test series of DT-IA (see 4.3a
through 4.3d) and DT-IIA, or after any test failure, the contractor shall
prepare an interim report (see 6.2.2). It shall include test data, test
data analyses, results of the marginality of success (MOS) analyses, copies
of instrumentation and photographic data, and completed graphical presentations.
Where applicable, the report also shall include a data matrix containing
the significant data from all previous tests in the same series.
4.7.3.3 Final test reports. For each test series and individual degection
tests, the contractor shall prepare a final test report (see 6.2.2) within
60 days following test completion. The report shall include, but not limited be
limited to:
Elements defined by the test plan and implemented in the
a.
test.
b.
Deviations from the test plan with justification for
each deviation.
c.
Actual test data and supporting data as required by the
test plan.
d.
Test results, observations, graphical presentations,
analyses, marginality of success analysis, anomalies,
problems encountered, design deficiencies.
Conclusions and recommendations.
e.
Proposed test classification with supporting rationale.
f.
4.7.3.3.1 DT-IA tests, inspections, reviews, and other events. Final
reports of DT-IA tests, unless otherwise specified in 4.7.3.3.2 or 4.7.3.3.3,
and all reviews, audits, and other events shall be in the contractor's normal
format. As a minimum, the reports shall provide the elements contained
in MIL-STD-831, Detailed Requirements.
4.7.3.3.2 Component, subsystem, and system test. Final reports of the
DT-IA tests specified in 4.3a and 4.3b and all DT-IIA tests shall be prepared
in accordance with MIL-STD-831.
4.7.3.3.3 Ejection tests. Final reports of the DT-IA tests specified in
4.3c and 4.3d, the DT-IB tests, and the DT-IIB ejection tests shall be
prepared in accordance with MIL-STD-831 and the appendix.
4.7.3.4 Summary test reports. Upon completion of each phase of the DT
program, the contractor shall prepare a summary test report in accordance
with MIL-STD-831 (see 6.2.2). The report shall:
a.
Identify all conducted tests, test series, and their
associated reports.