Click here to make tpub.com your Home Page

Page Title: Appendix Details Of Ejection Test Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-18471G(AS)
APPENDIX
Details Of Ejection Test Requirements
10 SCOPE
10.1  Scope.  This appendix details the ejection test facility, data,
classifications, and report requirements of the specification. This appendix
is a mandatory part of the specification. The information contained herein
is intended for compliance.
20 APPLICABLE DOCUMENTS
Government documents.
20.1
20.1.1 Specifications, standards, and handbooks. Unless otherwise speci-
fied, the following specifications, standards, and handbooks of the issue
listed in that issue of the Department of Defense Index of Specifications
and Standards (DoDISS) specified in the solicitation form a part of this
specification to the extent specified herein:
MILITARY SPECIFICATIONS
Aircrew Automated Escape Systems, Test Vehicles
MIL-A-81973
For Ground Track Performance Testing, Rocket And/
Or Jet Engine Propelled, General Specification For
MILITARY STANDARDS
Telemetry Standards
MIL-STD-1572
Test Methods For Telemetry Systems And Subsystems
MIL-STD-1573
(Copies of specifications, standards, handbooks, drawings, and publications
required by manufacturers in connection with specific acquisition functions
should be obtained from the contracting . -activity or as directed by the
contracting officers.)
30 REQUIREMENTS
30.1 Test facilities.  The area of the locale(s) selected for test(s)
shall ensure maximum safety of test personnel and the protection of personnel
and private property adjacent to the test areas. Test area access control
shall be exercised by the testing activity to preclude personnel not specifi-
cally authorized by the test facility test director from entering the test
area during test preparations, testing, post-test data acquisition, and
test article recovery and inspection phases. Access to test articles
shall be controlled to ensure that articles are not disturbed or damaged.
Failure to control access to test articles in the post-test recovery and
analysis phase of a test may result in a procuring activity classification
of the affected test(s) as "no test" and shall require such tests to be
reconducted at the expense of the activity responsible for the failure to
maintain access control.
77

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business