| MIL-S-24603A(SH)
1423 is not used, the data specified below shall be delivered by the contractor
in accordance with the contract or purchase order requirements. Deliverable data
required by this specification are cited in the following paragraphs.
Option
App licable DID no,
Paragraph no.
Data requirement title
Level 3
DI-DRPR-80651
3.16 and
Engineering drawings
appendix
----
DI-R-4803
4.1.2
Inspection system program
plan
----
UDI-T-23764
4.6.5
Report, component shop noise
tests
----
UDI-T-23753
4,6.6
Reports, equipment shock
test
---
UDI-T-23762
4.6,11
Report, vibration testing
----
DI-T-5329
4.7
Inspection and test reports
(Data item descriptions related to this specification, and identified in
section 6 will be approved and listed as such in DoD 5010.12-L. , AMSDL. Copies
of data item descriptions required by the contractors in connection with specific
acquisition functions should be obtained from the Naval Publications and Forms
Center or as directed by the contracting officer.)
6.2.2,1 The data requirements of 6,2.2 and any task in sections 3, 4, or 5
of this specification required to be performed to meet a data requirement may be
waived by the contracting/acquisition activity upon certification by the offeror
that identical data were submitted by the offeror and accepted by the Government
under a previous contract for identical item acquired to this specification.
This does not apply to specific data which may be required for each contract
regardless of whether an identical item has been supplied previously (for
example, test reports).
6.2.2.2 Technical manuals. The requirement for technical manuals should be
considered when this specification is applied on a contract. If technical
q anuals are required, Military specification and standards which have been
cleared and listed in DoD 5010.12-L (AMSDL) must be listed on a separate CDRL
(DD Form 1423), included as an exhibit to the contract. The technical manuals
must be acquired under separate contract line item in the contract.
6.3 First article. When a first article inspection is required, the item
should be a first article sample. The first article should consist of one unit.
The contracting officer should include specific instructions in acquisition
documents regarding arrangements for examinations, approval of first article test
results and disposition of first articles. Invitations for bids should provide
that the Government reserves the right to waive the requirement for samples for
first article inspection to those bidders offering a product which has been
15
|