Click here to make tpub.com your Home Page

Page Title: Table I. Test schedule.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-45921A(AR)
Test schedule.
TABLE I.
Number
Applicable
Inspection
1 through 40
Examination (see 4.5.2.1)
1.
1 through 40
2.
Functioning firing test (see 4.6.4)
1 through 40
Targeting and accuracy test (see 4.6.5)
3.
1, 2, 3 and 4
Adhesive and foam test (see 4.6.1)
4.
5 and 6
Twist test (see 4.6.2)
5.
Shock resistance (grenade firing) test
6.
(see 4.6.3)
13 through 40
7.
Shock resistance endurance test
19, 26, and 37
(see 4.6.6)
LOW temperature  shock  resistance  test
8.
7 and 8
(see 4.6.7)
9.
Low temperature abuse test (see 4.6.8)
9 and 10
11 and 12
10. Heat resistance test (see 4.6.9)
4.5.3.3
Testing.
4.5.3.3.1 Foam and adhesive testing.  Two stock assemblies
selected by the Government representative from each day's
production shall be tested by the contractor  using the test
Stocks may be selected prior to
method specified in 4.6.1.
application of the coatings.  Failure of any stock to meet the
requirements shall cause rejection of the day's production.
Five samples of stock assemblies
4.5.3.3.2  Twist  testing.
shall be taken from each inspection lot and shall be tested by the
contractor for the twist requirement using the test methods
Failure of any stock assembly to meet the
specified in 4.6.2.
requirements shall cause rejection of the represented lot.
4.5.3.3.3  Shock  resistance  testing.  When specified in the
contract, a sample of 10 stock assemblies shall be selected by the
Government representative from each month's production and shall
be forwarded to the designated testing agency.  The stock
assemblies shall be tested by the testing agency for the shock
resistance requirement using the test method specified in 4.6.3.
Failure of any stock assembly to meet the requirements shall cause
rejection of the represented lot.
4.5.3.3.4
Packaqinq
testinq.
4.5.3.3.4.1  Determination  of  cleanliness.  The contractor
shall test items from each inspection lot for cleanliness using
Sampling shall be in
the test method specified in 4.6.10.1.
accordance with MIL-P-116.
11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business