Click here to make tpub.com your Home Page

Page Title: Aquisition requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-45921A(AR)
Acquisition documents must
6.2 Aquisition requirements.
specify the following:
Title, number, and date of this specification;
a.
Issue of DODISS to be cited in the solicitation, and
b.
if required, the specific issue of individual documents referenced
(see 2.1.2).
c.
Requirement for submission of first article sample.
Inspection criteria not specified herein (See
d.
4.5.2.1).
List of inspection equipment pertinent to the stock
e.
assembly,  showing applicable revision dates.
That packages opened for examination shall be
f.
repackaged by the contractor at the contractor's expense.
g.  Shipping instructions for first article samples and
pilot packs (see 3.1, 4.5.3.3.3 and 5.1).
h.  When monthly samples are required (see 3.1.2,
4.5.3.3.3 and 5.1)
i.
Selection of applicable levels of preservation,
packaging and packing (see 5.1 and 5.2).
j.  Place of final inspection and acceptance (see "Notes"
in MIL-W-13855).
k.
List of acceptance inspection equipment to be
furnished the contractor (see 4.5.4) and responsibilities for other
Government property to be furnished the contractor.
l.  Procedures and methods for demilitarizing and
disposing of rejected material.
m.
Disposition of Government furnished property.
6.3 Test  aqency  coordination.  When action by a testing
agency is required, work programing will be effected with the
testing agency at the earliest practicable date.
17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business