|
| MIL-S-45921A(AR)
Acquisition documents must
6.2 Aquisition requirements.
specify the following:
Title, number, and date of this specification;
a.
Issue of DODISS to be cited in the solicitation, and
b.
if required, the specific issue of individual documents referenced
(see 2.1.2).
c.
Requirement for submission of first article sample.
Inspection criteria not specified herein (See
d.
4.5.2.1).
List of inspection equipment pertinent to the stock
e.
assembly, showing applicable revision dates.
That packages opened for examination shall be
f.
repackaged by the contractor at the contractor's expense.
g. Shipping instructions for first article samples and
pilot packs (see 3.1, 4.5.3.3.3 and 5.1).
h. When monthly samples are required (see 3.1.2,
4.5.3.3.3 and 5.1)
i.
Selection of applicable levels of preservation,
packaging and packing (see 5.1 and 5.2).
j. Place of final inspection and acceptance (see "Notes"
in MIL-W-13855).
k.
List of acceptance inspection equipment to be
furnished the contractor (see 4.5.4) and responsibilities for other
Government property to be furnished the contractor.
l. Procedures and methods for demilitarizing and
disposing of rejected material.
m.
Disposition of Government furnished property.
6.3 Test aqency coordination. When action by a testing
agency is required, work programing will be effected with the
testing agency at the earliest practicable date.
17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |