|
| MIL-S-48755A (AR)
Bobbin Assembly taping, Dwg. 9292982.
b.
c. Molding and assembly of Diaphragm and Diaphragm Assembly,
Dwgs . 9298598 and 9292998.
d.
Terminal Staking, Dwg. 9292991.
Assembly and crimp of Release Mechanism Assembly, Dwg.
9292991.
Molding and post cure of Ring, Ball Lock, Dwg. 9298586.
f.
Soldering of breakwire and lead wires to terminals, Dwg.
g.
9292972.
h.
Drill of Bobbin depth, Dwg. 9292976.
3.11 Soldering. Soldering procedures and acceptance criteria
for the soldered components shall be in accordance with MIL-S-45743,
except as specified in Appendix herein.
All parts shall be fabricated and finished
3.12 Workmanship.
in a thorough workmanlike manner, and all manufacturing, processing,
and assembly operations shall be correctly performed. They shall be
clean and free of burrs, sharp edges, unblended radii, surface
defects, chips, dirt, grease and oil, corrosion products and other
foreign matter. The cleaning method used shall not be injurious to
any part or assembly, nor shall they be contaminated by the cleaning
agent. Exterior surface coatings shall be continuous except for a
few light scratches not exposing base material. All required
markings shall be neat, legible and sharply defined. Required
packing shall be dry.
QUALITY ASSURANCE PREVISIONS
4.
4.1 Responsibility for inspection and standard quality
assurance provisions. Unless otherwise specified herein or in the
contract, the provisions of MIL-A-48078 shall apply and are hereby
made a part of this detail specification.
The following types of
4.2 Classification of inspections.
inspections shall be conducted on this item:
a.
First Article Inspection.
b.
Quality Conformance Inspection.
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |