| MIL-S-50379(MU)
(Copies of specifications, standards, drawings and packaging data sheet
required by suppliers in connection with specific procurement functions
should be obtained from the procuring activity or as directed by the
contracting officer.)
3.
REQUIREMENTS
3.1 Fabrication.- The sightunit shall be manufactured in accordance with
Drawing F10559698 and drawings pertaining thereto.
3.1.1 Telescope.- The telescope shall be fabricated in accordance with
Drawing F8588780 and drawings pertaining thereto, and shall meet the require-
ments of MIL-T-46324.
3.1.2 Mount.- The telescope mount shall be fabricated in accordance with
Drawing F10559699 and drawings pertaining thereto, and shall meet the
requirements of MIL-M-50380.
3.2 General specification.- The contractor shall be responsible for adherence
to, and compliance with, the requirements of MIL-F-13926 listed below:
(a)
Order of precedence
(b)
Dimensions and tolerances
(c)
Inorganic protective surface finishes
(d)
Part identification and marking
(e)
Workmanship
3.3 Telescope retention.- The telescope clamping mechanism shall prevent
movement of the telescope within the telescope mount when a 40 pound-inch 40 pound-inch
torque is applied to the telescope body. This requirement shall be met at
an ambient temperature between +60 and +90 Fahrenheit (F).
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.- Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified, the supplier may utilize his own facilites or any other
facilities suitable for the performance of the inspection requirements
specified herein, unless disapproved by the Government. The Government
reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies
and services conform to prescribed requirements.
4.1.1 General provisions.- The component and subassembly inspection require-
ments of MIL-F-13926 form a part of the quality assurance provisions of this
specification. Definitions of inspection terms shall be as listed in
MIL-STD-109.
4.2 First article (initial production) approval.- The requirement for
first article approval and the responsibility (Government or contractor)
for first article testing shall be as specified in the contract. The
sample for first article approval tests shall consist of three sightunits
|