4.3.2 Tests. The screening unit shall be tested as specified in
4.6.2 through 4.6.2.6. Failure of any test shall be cause for re-
jection.
When an initial production
4.4 Initial production inspection.
(see 3.3), screening units swill nbeg
screening unit(s) is specified
cree in
selected at random by the Government from ithe first five examined
tool ng, and will be
.
.
units being produced from production
aS specified in 4.6.1 and tested aS specified in 4.6.2 through
4.6.2.6 to determine conformance to the requirements of this speci-
fication. The inspection will be performedeby the Government at a
Acceptanc of an initial production
site selected by the Government. the remaining screening unit(s) from
screening unit shall not exclude
the quality conformance inspection and acceptance provisions speci-
fied in section 4.
4.5 Quality conformance inspection.
4.5.1 Examination. Examine each screening unit as specified in
for rejection.
4.6.1. Presence of one or more defects shall be cause
unit aS specified in 4.6.2.7.
4.5.2 Tests. Test each screening
Failure of the test shall be cause for rejection.
4.6 Inspection procedure.
4.6.1 Examination. Examine the screening unit for the following
defects. Examination or defects 114 through 118 shall be made while
the screening unit is operating.
|