MIL-S-63348A(AR)
6.7 MIL-I-45607, MIL-C-45662.  Unless otherwise specified (see
6.1 k), the contract should specify the application of MIL-I-45607
and MIL-C-45662 on the Management Control Summary List, DD Form 1660.
6.8 Inspection equipment designs. Inspection equipment designs
are of two types -  Government Special  inspection Equipment (SIE)
designs and contractor designs. SIE designs are designated by
drawing numbers under the "Method of Inspection" heading in Section
4, or in the Supplementary Quality Assurance Provisions,
Design
responsibility for all other inspection equipment is assigned to the
contractor.  However, the contractor need not furnish any design
when a complete Government SIE is part of the Technical Data Package
(TOP).  Unless otherwise specified, the contractor may submit
alternate or modified contractor designs of SIE in accordance with
6.8.2 and 6.8.3 should he elect to do so.
6.8.1  SIE
designs.
SIE designs may consist of any of the
following:
a. Detailed drawings which completely depict all information
necessary for the fabrication and use of the item of
inspection equipment.
b
A source control drawing or a specification control
drawing as defined in MIL-STD-100.
c.  An envelope drawing, as defined in MIL-STD-100, which
established the criteria which a detailed design shall
meet.  When envelope drawings are specified,the
contractor shall prepare designs which comply with the
criteria therein.
6.8.2 Contractor designs.  Contractor designs are required for
all inspection equipment for which SIE designs are not specified and
may include commercial equipment which the contractor proposes to
use. (Commercial equipment is defined as unmodified equipment which
is cataloged and available for purchase by the general public).
Contractor designs shall include appropriate operating instructions,
calibration procedures and maintenance procedures,  Commercial
equipment shall be fully described by catalog listings or other
means which provide sufficient information to permit identification
and evaluation by the Government and may include illustrations and
engineering data.  Designs shall be prepared for any special
fixture(s) required to be used with commercial equipment, or with
SIE designs if not otherwise covered thereby. Designs shall be of
the category and form (per MIL-D-1000) specified in the Contract
Data Requirements Lists (DD Form 1423).