|
| MIL-S-70536 (AR)
temperature for a period of 6 hours (min.). Then the simulator
shall be test fired. When necessary, the test specimens may be
removed from the conditioning cabinet, set up, and fired within 5
minutes. Observation shall be made for compliance with the
applicable requirement.
4.5.4.3 Leak test. The test shall be performed in accordance
with the procedure specified in para. 4.4.3.1 and 4.4.3.2 of
Test samples shall be tested at a differential
MIL-P-116H.
(Non-Destructive Test)
pressure of 1.3 P.S.I for 30 seconds minimum.
4.5.4.4 Leakage test. The test shall be performed in
accordance with the procedure specified in para. 4.4.3.1 and 4.4.3.2
or 4.4.3.6 of MIL-P-116H. After the test, the seal shall be
examined for compliance with the requirements of 3.4.4.
(Non-Destructive Test)
4.5.4.5 Heat seal of barrier bag. The test shall be performed
in accordance with the procedure specified in para. 4.4.4.3 of
MIL-P-116H. After the test, the seal shall be examined for
compliance with the applicable requirements (Destructive Test).
4.5.4.6 Jumble. The simulator assemblies shall be tested in
accordance with procedures specified in MIL-STD-331, Test 102,
except that the duration of the test shall be a minimum of 20
minutes. The assemblies and equipment shall be observed for
compliance with 3.4.5 (Destructive Test) l
PACKAGING
5.
Packaging shall be in accordance with drawing
5.1 Packaging.
9395639.
Packing shall be in accordance with drawing
5.2 Packing.
9395638.
5.3 Marking. Marking shall be in accordance with drawings
9395638 and 9395639.
NOTES
6.
6.1 Intended use. The components covered by this specification
are intended for use on the Simulator, Target Kill Assembly.
See MIL-A-48078.
6.2 Ordering data.
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |