Click here to make tpub.com your Home Page

Page Title: Classification of inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-70745 (AR)
3.9.2  Burrs.  All surfaces of the strip shall be free of any
rough edge which could cause definite removal of metal from the
cartridge case or injure personnel during handling.
3.9.3  Foreign  matter.  No strip shall contain chips, dirt,
grease, rust, corrosion, or other foreign matter.
4.
QUALITY ASSURANCE PROVISION
4.1  Responsibility  for  inspection.
Unless otherwise
specified in the contract or purchase order, the contractor is
responsible for the performance of all inspection requirements as
Except as otherwise specified in the contract
specified herein.
or order, the contractor may use his own or any other facilities
suitable- for the performance of the inspection requirements
specified herein, unless disapproved by the Government. The
Government reserves the right to perform any of the inspections
set forth in the specification where such inspections are deemed
necessary to assure supplies and services conform to prescribed
Reference shall be made to MIL-STD-109 to define
requirements.
terms used herein.
All items must meet all
4.1.1  Responsibility for compliance.
requirements of sections 3 and 5.  The inspections set forth in
this specification shall become part of the contractor's overall
The absence of any
inspection system or quality program.
inspection requirements in this specification shall not relieve
the contractor of the responsibility for assuring that all
products or supplies submitted to the Government for acceptance
comply with all requirements of the contract.
4.2 Classification of inspection. The inspection requirements
specified herein are classed as follows:
a.
First article inspection (see 4.3)
b.
Quality conformance inspection (see 4.4)
Unless otherwise specified, all
4.2.1
Inspection  conditions.
inspection
shall be performed in accordance with the test
conditions
specified in the retirements and test method
paragraphs
in this specification and all requirements of the
applicable
drawings.
4.3.
First article inspection.
4.3.1  Submission.  The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with the provisions of 4.3.2. The first
article shall consist of the following items in quantities as
indicated:
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business