Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-45379D(AT)
3.9 Identification data plates. All plates shall be in accordance with the applicable drawings
(see 4.10).
3.10 Marking. Marking and marking paint shall conform to TT-E-527, lusterless black,
color chip 37038 of FED-STD-595 as specified on Drawing 8750019 (see 4.11).
3.11 Workmanship. the workmanship shall be of a quality to assure that the vehicle and
components thereof conform to the drawings and detail specifications at time of manufacture and
break-in (see 4.12).
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase
order (see 6.2), the contractor is responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified in the contract or purchase order, the contractor
may use his own or any other facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the Government. The Government
reserves the right to perform or witness any of the inspections set forth in the specification where
such inspections are deemed necessary to assure supplies and services conform to prescribed
requirements.
4.1.1 Inspection equipment. Unless otherwise specified in the contract (see 6.2), the
contractor is responsible for the provision and maintenance of all inspection equipment necessary
to assure that supplies and services conform to contract requirements. Inspection equipment
must be capable of repetitive measurements to an accuracy of 10 percent of the measurement
tolerance. Calibration of inspection equipment shall be in accordance with MIL-STD-45662.
4.2 Classification of inspection:
a. First article inspection (see 4.4).
1. Preproduction inspection (see 4.4.1).
2. Initial production inspection (see 4.4.2).
b. Quality conformance inspections (see 4.5).
1. Acceptance tests (see 4.5.2).
2. Control tests (see 4.5.3).
3. Comparison tests (see 4.5.4).
4.3 Inspection conditions. Unless otherwise specified (see 6.2), all inspections shall be
conducted under the following conditions:
a. Air temperature 23 + 10 C
b. Barometric pressure 725 + 50mm Hg
- 75
c. Relative humidity 50 + 30 percent
36

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business