MIL-T-48466B(AR)
specifically requested to do so in the solicitation.
Previous revisions of MIL-T-48466(AR)
6.4  Supersession.
were for the U.S. Army Armament Research, Development, and
Engineering Center's internal use only, and were not forwarded to
the Naval Publications and Form Center for publication.
6.5  Submission of contractor inspection equipment designs
for approval.  Submit copies of designs as required to:
Commander, U.S. Army ARDEC, ATTN:
SMCAR-QAF-I, Picatinny
Arsenal,  NJ 07806-5000.
This address will be specified on the
Contract Data Requirements List, DD Form 1423 in the contract.
6.6  Drawings.
Drawings listed in Section 2 of this
specification under the heading U.S. Army Armament, Research,
Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as U.S. Army Armament,
Research and Development Command (ARRADCOM), Frankford Arsenal,
Rock Island Arsenal or Picatinny Arsenal.  Technical data
originally prepared by these activities is now under cognizance
of ARDEC.
6.7
Levels of packaging .
The following definitions describe
the three levels of packaging in accordance with MIL-STD-2073-1.
a.
Level A - Adequate protection for indeterminate
storage and worldwide distribution.
b.
Level B - Adequate protection for known shipment
conditions and storage conditions normally not exceeding one year.
c.
Level C - Adequate protection for shipment to a known
site for immediate use.
6.8  Alternative quality conformance provisions .
Alternative
quality conformance procedures, methods, or equipment, such as
statistical process control, tool control, other types of sampling
procedures, etc., may be used by the contractor when they provide,
as a minimum, the level of quality assurance required by the
provisions specified herein.
Prior to applying such alternative
procedures, methods, or equipment, the contractor shall describe
them in a written proposal submitted to the Government for
evaluation.
When required, the contractor shall demonstrate that
the effectiveness of each proposed alternative is equal to or better
than the specified quality assurance provision(s) herein.
In cases
of dispute as to whether the contractor's proposed alternative(s)
provides equivalent assurance, the provisions of this specification
shall apply.
All approved alternative provisions shall be
specifically incorporated into the contractor's quality program
or detailed inspection system, as applicable.
Unless otherwise
specified in the contract, proposed alternative quality conformance
provisions will be submitted by the contractor for evaluation
15