| MIL-T-48558B(AR)
does not authorize submission of known defective material,
either
indicated or actual, nor does it commit the Government to
acceptance of defective material.
4.1.2 General
provisions. The component and subassembly
inspection requirements of MIL-F-13926 form a part of the quality
assurance provisions of this specification. Definitions of
inspection terms shall be as listed in MIL-STD-109.
4.2 First article (initial production) approval. The
requirement for first article approval and the responsibility
(Government or contractor) for first article testing shall be
specified in the contract. The sample for first article approval
tests shall consist of three (3) telescopes, plus three (3) each
of all items covered by Quality Assurance Provisions (QAPS). The
sample shall be manufactured in the same manner, using the same
materials, equipment, processes, and procedutes as used in regular
production. All parts and materials, including packaging and
packing, shall be obtained from the same source of supply as used
in regular production. The 3 quadrants shall be tested in
accordance with, and meet the requirements of Tables I and II and
paragraph
4.7.2.
4.2.1 Government
testing. When the Government is
responsible for conducting first article approval tests, the
contractor, prior to submitting the sample to the Government,
shall inspect the sample to insure that it conforms to all
requirements of the contract and submit a record of this
inspection, including certificates of conformance for materials.
4.2.2 Contractor
testing. When the contractor is
responsible for conducting first article approval tests, the
sample shall be inspected-by the contractor for all the
requirements of the contract. The sample and a record of this
inspection, including certificates of conformance for materials,
shall be submitted to the Government for approval. The Government
reserves the right to witness the contractor's inspection.
4.3 Examination
and
tests.
4.3.1 Components
and subassemblies. All components and
subassemblies shall be
Inspected In accordance with the inspection
provisions contained in
the QAPs listed in the Technical Data
Package (TDP). In the
absence of QAPs, the applicable Quality
Assurance Provisions of
MIL-0-13830 and MIL-F-13926 shall apply.
4.3.2 Final acceptance inspection. Subsequent to first
article approval, examination and tests related to Section 3
herein shall be performed. The tabulated classification of
8
|