Click here to make tpub.com your Home Page

Page Title: High (operatinq and non-operatinq)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-48621A (AR)
4.7.1.2 Shock.  This test shall be performed as specified in
Procedure I, Section II of Method 516 of MIL-STD-810 except that:
a.
The post test functional check (Step 5 of Procedure I)
need not be conducted until completion of all shock Impulses.
1
b.
The shock pulses shall be 15 g's + 10% amplitude and 11 ms
+ 10% duration.
c.
The maximum g shall occur at 5.5 milliseconds + 10%.
d.
The shock
system shall have a flat frequency
measuring
response
within + 10% from 20 + 2,000 hertz.
I
After the application all the  shock impulses the noise tester
shall be tested as specified in 4.7.2 and 4.7.3 to determine
compliance with 3.3.8.
4.7.1.3 Altitude (operating and non~~
Thl& test shall
be performed
led in Procedures I, Met
500 of MIL-STD-81O.
The operational checkout shall be as specified in 4.7.2 and 4.7.3 for
compliance with 3.3.9.
4.7.1.4 Temperature.
4.7.1.4.1 Highoperatinq and non-operatinq)
This test shall
be pezformed aa specified
and IX, Method 501 of
Procedures
MIL-STD-81O with constant temperature extremes as specifieed h 3.3.10.
The operational checkout shall be as specified In 4.7.2 and 4.7.3 for
compliance with 3.3.10.
4.7.1.4.2  Low (operating  and non-operatinq)
This test shall be
performed as specified in Procedures I and II, Method 502 Of
MIL-STD-81O with constant temperature extremes as specoified in 3.3.1o.
The opera%%onal checkout shall be as specified in 4.7.2 and 4.7.3 for
compliance with 3.3.10.
4.7.1.5 Humidity (non-operatinq
This test shall be performed
in accordance with Procedure III, Method 507 of MIL-STD-81O except
that in Step 7, checkout shall be performed at the conclusion of the
test only, with the Item at standard ambient conditions.  The
operational checkout shall be as specified in 4.7.2 and 4.7.3 for
compliance with 3.3.11.
The fungus test shall be performed in accordance
4
.7.1.6 Fungus
with MIL-STD-81O, Method 508, Procedure 1.
4.7.1.7 Bench handlinq.  The bench handling test shall be
performed in accordance with MIL-STD-81O, Method 516, Procedure I.
4.7.1.8 EMI/RFI.  The EMI/RFI shall be performed IAW MIL-STD-461
CE03, CSC)l, CS02, CS06, RE02 and RS03 except the upper limit of RS03
shall be 0.1 V/M.
25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business