Click here to make tpub.com your Home Page

Page Title: Contractor testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-50382(MU)
4.2.2 Contractor testing. - When the contractor is responsible for
conducting first article approval tests, the sample shall be inspected
by the contractor for all the requirements of the contract. The sample
and a record of this inspection, including certificates of conformance
for materials, shall be submitted to the Government for approval. The
Government reserves the right to witness the contractor's inspection.
4.3 Inspection Provisions.
4.3.1 Submission of product. - Unless otherwise specified by the
contracting officer, inspection lot size, lot formation and presentation
of lots shall be in-accordance with "Submission of Product" provisions of
MIL-STD-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies. - All components and sub-
assemblies shall be inspected in accordance with the inspection provisions
contained in Supplementary Quality Assurance Provisions (SQAP) listed in
the List of Inspection Documents (IEL), when provided with the technical
data package (TDP). In the absence of SQAPS, the applicable Quality
Assurance Provisions of MIL-F-13926 shall apply.
4.3.2.2 Final acceptance inspection. - Subsequent to first article
approval, examination and tests related to Section 3 herein shall be
performed on a single defect (Individual characteristic) basis in accord-
ance with MIL-STD-105 and the sampling plans specified in Table I herein.
Examination and tests for Packaging, Packing and Marking shall be in
accordance with MIL-P-14232 and Section 5 herein. The tabulated classifi-
cation of defects in Table I shall constitute the miniuum inspection to
be performed by the supplier after first article approval and prior to
Government acceptance or rejection by item or lot.
TABLE I - CLASSIFICATION OF DEFECTS
TEST PROCEDURE
CHARACTERISTIC
CLASS
CRITICAL:  100% Inspection
4.6.1.1
3.6.1
1.  Pressure (optical assembly)
4.6.1.1.1
3.6.2
2.  Pressure (counter assembly)
AQL 1.0% Defective
MAJOR :
4.7.2.1
3.7.1
101.
Previbration collimation
4.7.2.1.1
3.4.3
Vibration
102.
4.7.2.1.2
3.4.3
Post-vibration collimation
103.
4.7.2.1.3
3.7.2.1
104.
Image wander
4.7.2.1.4
3.5
Cleanliness
105.
4.7.2.1.5
3.7.2
Image tilt
106.
4.7.2.1.6
3.7.4
Parallelism of image & reticle
107.
4.7.2.1.7
3.7.7
108.
Eyepiece focus
4.7.2.1.8
3.7.9
109.
Parallax
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business