Click here to make tpub.com your Home Page

Page Title: Final acceptance inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-50384(MU)
contained in Supplementary Quality Assurance Provisions (SQAP) listed in
the List of Inspection Documents (IEL), when provided with the technical
data package (TDP). In the absence of SQAPS, the applicable Quality
Assurance Provisions of MIL-F-13926 shall apply.
4.3.2.2 Final acceptance inspectioon. - Subsequent to first article
approval, examination and tests related to Section 3 herein shall be
performed on a single defect (individual characteristic) basis in accord-
ance with MIL-STD-105 and the sampling plans specified in Table II herein.
Examination and tests for Packaging, Packing and Marking shall be in
accordance with MIL-P-14232 and Section 5 herein. The tabulated classifi-
cation of defects in Table II shall constitute the minimum inspection to
be performed by the supplier after first article approval and prior to
Government acceptance or rejection by item or lot.
TABLE II - CLASSIFICATION OF DEFECTS
REQUIREMENT
TEST PROCEDURE
CLASS
CHARACTERISTIC
CRITICAL 100% INSPECTION
4.6.1.2
1.  Sealing
3.7
2.  Pressure
3.7
4.6.1.2
AQL 1.0% DEFECTIVE
MAJOR:
3.8.2.1 &
4.6.2.2
101.
Pre-vibration collimation
3.8.2.2
4.6.2.3
3.5
102.
Vibration
4.6.2.4
3.6
Cleanliness
103.
3.5
4.6.2.5
104.
Post-vibration
3.8.3
4.6.2.6
105.
Eyepiece focus
3.8.8
4.6.2.7
106.
Reticle plumb travel
3.8.6
4.6.2.8
107.
Reticle shift
4.6.2.9
3.8.10
108.
Parallax
3.8.7
4.6.2.10
109.
Resolution
3.8.5
4.6.2.11
110.
Image tilt
3.8.4
4.6.2.13
111.
Reticle accuracy
4.6.2.14
3.9
112.
Operability
4.6.2.15
3.10
113.
Illumination
3.8.9
4.6.2.12
Parallelism image & reticle
114.
MINOR:
None defined
4.3.3 Acceptance and rejection. - Rejected lots shall be screened
for all defective characteristics. Removal or correction of defective
units and resubmittance of rejected lots shall be in accordance with
"Acceptance and Rejection" as specified in MIL-STD-105.
4.4 Special sampling.
4.4.1 General. - Three telescopes shall be selected at random as a
special sampling from each 100 produced. The sample shall meert the
requirements and tests in Table III.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business