Click here to make tpub.com your Home Page

Page Title: Gunfire
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-5578C
6.5 Service life. Based on past experience,
of approval or disapproval will be given by the
applicable procuring activity to the aircraft
it is considered that the normal service life of
manufacturer. A copy of such notification will
fuel cells covered by this specification is equiva-
be supplied to the fuel cell manufacturer.
lent to that of the aircraft in which they are
6.4.2 Request for information pertaining to
installed.
the phase I or phase II preproduction tests
6.6 Gunfire. The procuring activity may
should be addressed to Commander, Aeronauti-
have one round of 40-millimeter high explosive
cal Systems Division, Wright-Patterson Air
statically detonated 24 inches from the outside
Force Base, Ohio, Attention: ASNPFP; to the
of the tank. The results of this round will not
Bureau of Naval Weapons, Navy Department,
be utilized in appraising and formulating tank
Washington 25, D.C.; or to the Contracting
approval decision, but will aid in the develop-
Officer, U.S. Army Aviation and Surface Mate-
ment of a possible cell construction that the
riel Command, P.O. Box 209, Main Office, St
Services are desirous of obtaining.
Louis, MO, with copies to the other Services.
6.4.2.1 Preemptive approval. Preemptive
6.7 Special environment. When the test
approval is herein defined as approval for phase
methods specified herein do not represent the
I tests, conducted without contractual coverage.
tank environment, for example, temperatures
Reports of tests, in accordance with MIL-T-
resulting from aerodynamic heating in excess
9107 should be furnished in duplicate to the ad-
of 160 F, the test method should be modified
dressees as shown in 6.4.2. These reports should
as agreed upon by the contractor and the pro-
be signed or approved by a responsible repre-
curing activity to simulate operational comdi-
sentative of the manufacturer or the laboratory
tions.
in which the tests are conducted. Preemptive
approvals may be accepted at the option of the
Custodians:
Preparing activity:
Air Force-ASD
Army-MO
contractor in lieu of the phase I preproduction
Project No., 1560-0014
Navy-Weps
approval specified in 4.3.3.1.1.
Air Force-ASD
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business