Click here to make tpub.com your Home Page

Page Title: Air conditioning and heating test data
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-62223B(AT)
shall be verified to determine that the heating system is capable of maintaining the inside body
temperature at a minimum of 70F (21C) midway between the floor and ceiling in 0F (-18C)
outside ambient with no occupants.
4.4.4.4 Air conditioning and heating test data. Results of the air conditioning and
heating tests performed in accordance with 4.4.5.2 and 4.4.5.3 shall be recorded. Test data,
including a description of all applicable pertinent test conditions, shall be recorded and furnished
to the Government representative. If the vehicle manufacturer has previously tested an identical
model vehicle with the same components within a 12-month period, a certification and the
specified test data verifying conformance to this specification may be provided in lieu of the first
production vehicle air conditioning or heating test. Certification and previous test results, if
furnished, shall be forward to the engineering office of the procuring activity with the
commercial vehicle engineering data (questionnaire).
4.4.4.5 Water system test. To determine conformance to 3.5.9 and 3.7.11 the water
system shall be subjected to a hydrostatic test. The in-place water supply system and water
heater with connections shall withstand a pump pressure of 40 to 50 psi for a period of not less
than 30 minutes with no evidence of leaking and no additional air or water being required to
maintain the pressure. During the test period, the water system and water heater and connections
shall be observed for leakage, undue noise and damage as a result of the test.
4.4.4.6 Water drain system test. To determine conformance to 3.5.9 and 3.7.11 the water
drainage system shall be tested for leakage. With the main drain outlet capped, the sink shall be
filled with water. After a period of not less than 30 minutes, the drain system shall be examined
for leaks. Evidence of any leakage during the test shall be cause for rejection.
4.4.4.7 Laboratory equipment test. To determine conformance to 3.5.10.4,
subparagraphs (b) and (h), the two automatic refrigerated centrifuges and the blood bank
refrigerator shall be subjected to a functional test. Both centrifuge units with elevated control
panel shall be operated to verify that the speed selector permits automatic acceleration to all
speeds from 150 rpm to 6,000 rpm. The refrigeration system shall be observed to verify that the
entire temperature control range of 32F (0C) to plus 86F (30C) at full speed and temperature
readout from -5F (-20C) to plus 104F (40C). Both timers shall be observed for satisfactory
performance for a period of 30 minutes. The blood bank refrigerator shall be operated and
observed for satisfactory performance with the temperature monitor, the factory set automatic
30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business