Click here to make tpub.com your Home Page

Page Title: Emergency venting (type II)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-62357A
(f) Failure of any vehicular safety device such as brakes or electrical circuits
(g) Evidence of structural weakness in any part of the vehicles, vehicle components,
accessories or welds.
(h) Loose mountings of parts or accessories due to workmanship or vehicular operation.
4.3.5 Pump test. When an engine driven pump is specified, the pumping equipment shall be
tested with water to determine conformance to the requirements specified in 3.9.7.
4.3.6 Breakaway test. On air hydraulic brake equipped vehicles, breakaway conditions shall
be simulated by disconnecting brake supply lines and the brake system relay emergency valve shall
provide and maintain brake application for not less than 15 minutes. At the end of the 15 minutes,
air pressure bleed-down shall provide not less than a 5-pound per square inch (psi) drop in air
pressure.
4.3.7 Emergency venting (type II). On type II trailer, the exposed surface area of the tank
shall be measured and the capacity of each vent determined by its required stamping and
certification (see DOT 178.345, 346). The total venting capacity shall be calculated and
compared to the surface area to determine conformance to the requirements of DOT Safety
Regulation 178.346.
4.3.8 Availability of regulations. The contractor shall make available to the Government at
the point of final acceptance a current copy of DOT Safety Regulation 178.345 and DOT Safety
Regulation 178.346. The documents shall be surrendered to the Government representatives for
use in conjunction with the contract for the duration of the contract.
4.3.9 Joint specimens. The contractor shall offer for Government inspection and approval the
joint test specimens subjected to the tensile test required by DOT Safety Regulation 178.345,
together with certification regarding the date of preparation and testing. The test specimens shall
be current in accordance with 178.345.
*  4.3.10 Toxic data and formulations. The supplier shall furnish a copy of the approval by the
procuring activity of the materials used in the construction of the vehicle (see 3.1.1.4). The
vehicle shall be inspected and the manufacturer shall provide evidence that only the approved
materials were used in the construction and treatment of the affected parts of the vehicle.
4.3.11 Production sample. Upon acceptance of the first production vehicle, it shall remain at
the manufacturing facility as a production sample, and shall be the last vehicle shipped on the
contract. The contractor shall maintain the vehicle in a serviceable condition for the duration of
the contract.
26

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business