|
| ![]() MIL-T-62531(AT)
APPENDIX C
Decision tree flow chart
STEPS
GUIDELINES
CLASSIFICATION
1
Does the incident concern RAM?
- NO
Non-RAM Oriented
YES
2
Was the incident detected during initial
- YES
No-test
inspection?
NO
3
Did incident result from test item abuse,
- YES
No-test
unrealistic operating conditions, accident,
or not following prescribed maintenance
or operating procedures?
NO
4
Was the incident a kit installation,
- YES
No-test
authorized MOD, engineer evaluation, or
a manual/maintenance evaluation?
NO
5
Was the incident detected during an
- YES
No-test
inspection or operation for which no
action, or only authorized scheduled crew
maintenance was required?
NO
6
Was incident a scheduled replacement/
- YES
Scheduled maintenance
service?
NO
7
Was incident caused by another incident?
- YES
Unscheduled maintenance
NO
8
Was the incident an incipient malfunction
- YES
Unscheduled maintenance
detected during scheduled unit
maintenance or detected during operations
for which correction can be deferred to a
scheduled maintenance corrected at that
level?
98
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |